Fri July 11 and Sat July 12
Announcments and detailed plans WIP. Meanwhile, check out Wiki home
Register for updates: https://nextcloud.k-space.ee/apps/forms/s/dRmM4cXRyTA2fxbtg9skaR7K
¶ 2025-07-11 and 2025-07-12 Planned
from k-space.ee/todo
https://git.k-space.ee/k-space/todo/issues/116
-
Lauri will come and work on kube.
-
PVE move from blades to pizzas: Rasmus, Arti, akpall
- Pending: new SSDs (and hot/cold side?)
- Pending: What pizzas exactly
-
NAS move: Lauri, eaas, Rasmus; pls update https://wiki.k-space.ee/en/hosting/storage
-
Networking (configs): eaas, Kristjan
- Router-switch upgrades will be done outside of Hackathon time, likely end of June.
-
Cameras install + cable runs
- Ask Rasmus for location of cameras + where the cables will run to/from.
- Connection + VLAN is out of scope, bonus.
-
lightswitches install
- Pending: eaas for WiFi+VLAN
- Take: Rasmus electrician tools
-
3D-Printing: Sander
-
New keybox install
- Pending: Confirm existance of new box on-floor.
-
Announcments
- Pending: Internal 'media kit'
- Pending: Slack
- Pending: Mail
- Pending: Facebook, Instagram
- Pending: Vallaosa leht
- Pending: On the building doors / Tehnopol channels?
-
Food
- Pending: What, how, whom, headcount, budget?
- Pending: Talgupolicy
- Lift room lights
- Signs: k6, instructions, update doors
- Networked PDU evitamine
- Inventuur
- Accounting Merit <-> OIDC persistant connection (or sync notifier)
- ? kaablinagid ?
- ? serv room hot/cold ?
- ?? Chaos move ??
¶ 2025-06-27 Prehackathon network maintenance
- Upgrades for switches, routers, APs
- Configuration changes, including in preparation for the Hackathon
- If new hardware and configuration is validated by then, fasttrack NAS and PVE migration.